Back to Projects

Tatu City Water Supply and Irrigation Project, New City

Nairobi
Completed 08/07/2026
Our Work

Project Overview

Bosch Water designed and implemented a state-of-the-art water supply and irrigation system for Tatu City, one of Africa’s largest new urban developments. Engineered to serve a future population of 500,000 residents, the system integrates high-capacity transmission mains, automated pumping stations, storage reservoirs, smart metering, and a dedicated irrigation network for green spaces and agricultural zones.

The Challenge

Tatu City required water infrastructure capable of matching the scale and ambition of a full-fledged new city. The key challenges included:

  • Delivering potable water to a rapidly developing, multi-zone urban environment
  • Managing water pressure across varying elevations and distances
  • Providing irrigation for extensive green spaces and agricultural plots without straining the potable water supply
  • Ensuring long-term sustainability, scalability, and operational efficiency
  • Meeting Kenyan water quality and environmental regulations

Our Solution

Bosch Water was engaged to design and implement a phased, state-of-the-art water supply and irrigation system built to grow with the city.

  1. Water Supply System
    • Designed a high-capacity transmission and distribution network.
    • Installed primary and secondary pumping stations with variable frequency drives (VFDs) for energy efficiency.
    • Constructed and integrated storage reservoirs to buffer peak demand and provide emergency reserves.
    • Deployed smart metering and SCADA systems for real-time monitoring, leak detection, and demand forecasting.

     2. Irrigation Infrastructure

    • Developed a separate, non-potable irrigation network for landscaping, parks, and agricultural zones.
    • Utilized drip irrigation and micro-sprinklers to minimize water waste.
    • Integrated rainwater harvesting and treated wastewater reuse where feasible.

    3. Smart Technology & Monitoring

    • SCADA-based real-time monitoring across the entire water network.
    • Smart metering for accurate demand tracking and billing.
    • Automated leak detection to reduce water losses.
    • Remote pump control for optimized energy use and pressure management.

   4. Sustainability & Future-Proofing

    • Modular, phased design that expands as Tatu City grows toward its 500,000-resident target.
    • Energy-efficient pumps and gravity-fed sections reduce operational costs and carbon footprint.
    • Water reuse and storage strategies reduce reliance on external sources.
    • Compliant with Kenyan water quality and environmental standards.

Results & Impact

  • Reliable water supply to early-phase residential, commercial, and industrial developments
  • Irrigation coverage for public parks, streetscapes, and agricultural plots
  • A scalable framework capable of serving the full 500,000-resident population
  • Reduced operational costs through smart technology and energy-efficient design
  • Reduced water losses and optimized energy use
  • A model for integrated urban water management in East Africa
What We Did

Project Highlights

Key elements of the solution delivered by Bosch water for this project.

Population Served

Designed to supply clean, reliable water to a future population of 500,000 residents

State-of-the-Art Water Supply System

End-to-end design and implementation of a modern, pressurized water network

High-Capacity Transmission & Distribution

Primary mains, storage reservoirs, and distribution networks built for a growing city

Automated Pumping Stations

High-efficiency booster pumps with VFDs for consistent pressure and energy savings

Dedicated Irrigation Network

Separate non-potable system for parks, green spaces, and agricultural zones

Water-Efficient Irrigation Technology

Drip and micro-sprinkler systems to minimize water waste

Smart Monitoring & Metering

SCADA-based real-time monitoring, leak detection, and demand management

Sustainable Design

Rainwater harvesting and treated wastewater reuse intergrated where feasible

Future-Proof & Scalable

Modular, phased design that expands as Tatu City grows

Energy Efficient

Gravity-fed sections and energy-efficient pumps reduce operational costs and carbon footprint

Regulatory Compliance

Meets Kenyan water quality and environmental standards

Flagship Urban Water Project

A model for integrated urban water management in East Africa

Project Gallery

See Our Work

Click an image to view it larger

Project Video

Watch the Project

Client Feedback

“Bosch Water delivered a water supply and irrigation system that matches the scale and ambition of Tatu City. Their team designed a solution that serves our current needs while giving us the capacity to grow to 500,000 residents. The engineering quality, smart technology, and attention to sustainability have been exceptional”

Tatu City Water Supply and Irrigation Project, New City

Our Approach

From Need to Solution

Every Bosch water project begins by understanding the client's needs and ends with a practical, reliable water solution.

01

Understand

We assess the project's requirements, location, water needs and objectives.

02

Engineer

We develop and recommend the appropriate equipment and engineering solution.

03

Deliver

We implement the solution with focus on quality, reliability and long-term performance.

Start Your Project

Have a similar water project?

Talk to Bosch water about your water requirements. Whether you need borehole drilling, pumping, irrigation, water treatment or another solution, our team can help.